Pacesetting coal slimes facility commissioned
Nov 16, 2015· It provides unlimited capacity due to continuous reclamation of the dried coal slimes, which can be used as a fuel source. The facility consists of four ponds, each with a capacity of 365 000 m3, two return water dams, each of 68 000 m3 capacity, a pump station, a substation and a .